Public portfolio simulation

PNI-CENTER / seeded synthetic data

ControlsKPIsModernizationAlignment

Physical Network Inventory Command Center

Fiber inventory operations cockpit for PNI quality, modernization, governance, and handoff readiness.

A public interactive portfolio dashboard for Michael Ray aligned with the public Zayo Senior Manager PNI requisition R0017092. It demonstrates operating judgment through formula-backed KPIs, route and market selection, scenario controls, target governance, and workflow drilldowns.

Public portfolio simulation only. Uses seeded synthetic representative telecom inventory records created for demonstration. It does not use Zayo internal data, does not imply Zayo employment, and is not an operational Zayo system.

Operate the scenarioExport synthetic KPI CSV

Integrity

92.9%

Gap vs target 98.5%

SLA attainment

86.2%

Watch vs target 90%

Modernization

62%

Gap vs target 85%

Governance closure

88.3%

Gap vs target 95%

Scenario active

Business as Usual

Steady intake, moderate validation coverage, normal backlog pressure, and incremental cleanup.

Scenario selector, filters, and adjustable targets

Operate synthetic conditions and watch KPIs re-score

Current assumption: Baseline seeded model: 20,000 synthetic assets, 2,500 synthetic tickets, 500 synthetic exceptions.

Adjust individual portfolio demonstration KPI targets

Executive KPI strip

Click a KPI for formula, owner, scope, and synthetic drilldown

KPI formula drilldown

Inventory Integrity Score

Gap

Prioritize remediation waves and stakeholder escalations when inventory can no longer be trusted for design, service delivery, maintenance, or break/fix.

Formula
0.35 × Completeness + 0.25 × Accuracy + 0.20 × Consistency + 0.10 × Freshness + 0.10 × Referenced Record Rate.
Owner / cadence
PNI operations governance
Weekly executive review
Current scope
Metro A ring; 13,200 synthetic assets; 1,500 synthetic workflow tickets.
Boundary
No real customer names, facility IDs, CLLI codes, proprietary route details, or Zayo internal data.

Integrity component audit

Weighted synthetic model
completeness94.6%
accuracy92.7%
consistency91.8%
freshness89.5%
referenced93.2%

Public portfolio simulation only. Uses seeded synthetic representative telecom inventory records created for demonstration. It does not use Zayo internal data, does not imply Zayo employment, and is not an operational Zayo system.

Interactive synthetic topology

Representative market and route health

Selected: Metro A ring
Route riskAMBER
Support readiness86.4%
Synthetic linked tickets246

Operational value signal

Estimated rework avoidance

80

Synthetic tickets avoided compared with the seeded baseline scenario. This is a simulation output, not a financial claim or real operator result.

Duplicate / collision rate1.8%
Audit sample rows1,200
Governance exceptions500

Modernization wave visualization

Migration, reconciliation, validation

Wave 1 - Access Fiber

legacy / GIS · blocker: field evidence gaps

58%
MapTransformLoadReconcileValidateRelease

Selected route dependency: Metro A ring validates route diversity before release.

Wave 2 - Optical Transport

Nokia 1830 / EMS · blocker: shelf-card-port lineage

48%
MapTransformLoadReconcileValidateRelease

Wave 3 - Equipment Hierarchy

Granite-like · blocker: orphan racks and ports

41%
MapTransformLoadReconcileValidateRelease

Wave 4 - GIS / Records Reconciliation

GIS source · blocker: spatial tolerance review

32%
MapTransformLoadReconcileValidateRelease

Workflow and governance panels

Queue discipline and control loop

Intake

315

Engineering / Operations

Validate

270

Records / GIS

Remediate

210

PNI queue

Govern

210

Controls

Release

360

Downstream handoff

Controls heatmap

92%Mandatory fields
89%Parent/child
86%GIS tolerance
83%Duplicate match
80%Audit evidence
77%Release gate
74%API lineage
71%Owner signoff

Exception register sample

Missing relationshipSYN-420high
Geometry mismatchSYN-421high
Migration reconciliation gapSYN-422high
Unauthorized manual overrideSYN-423critical

Candidate-role alignment

Michael Ray background mapped to the public R0017092 PNI responsibilities

Designed around the public Senior Manager, Physical Network Inventory requisition R0017092: operational management of PNI systems, data accuracy and completeness, modernization/consolidation, governance, workflow improvement, automation, and partnership across Engineering, Operations, IT, Network Records, GIS, Product, planning, construction, maintenance, and break/fix teams.

Verified candidate facts kept exact

  • ◇27 years telecom
  • ◇approximately 14 years engineering
  • ◇Granite and Blue Planet Inventory
  • ◇Nokia 1830 DWDM
  • ◇10G/100G/400G transport
  • ◇Carrier Ethernet, IP/MPLS, GPON/Active Ethernet
  • ◇30–35 designs/month
  • ◇20–30 estimates/month
  • ◇technical leadership/mentoring without formal manager title

PNI operational ownership

Uses KPI formulas, targets, queues, and decision triggers to show how inventory quality becomes a managed operating rhythm.

Modernization and consolidation

Wave plan visualizes mapping, migration, reconciliation, validation, and blocker triage for representative physical inventory domains.

Governance and standards

Control panels expose mandatory fields, lineage checks, exception closure, and owner accountability without implying proprietary standards.

Cross-functional support

Workflow model separates Engineering, Operations, IT, GIS, Network Records, Service Delivery, Maintenance, and Break/Fix dependencies.

Accuracy note: technical leadership and mentoring are represented as functional leadership experience, not as a claimed formal manager or direct-report title.

Synthetic-data boundary: Public portfolio simulation only. Uses seeded synthetic representative telecom inventory records created for demonstration. It does not use Zayo internal data, does not imply Zayo employment, and is not an operational Zayo system. The public citations and requisition alignment are documented in the README; generated records are fabricated and deterministic.